Federal Government

J. Edgar Hoover Building

The original cafeteria tile floor of the J. Edgar Hoover building was showing signs of wear.  JVP provided mechanical, electrical, plumbing and fire protection design services for the replacement of the floor and for the conversion of the dishwashing room into a conference room. Services also included surveying, field investigation, providing contract drawings, specifications, calculations and cost estimates.