The old pool facility on the Wilson High School campus was condemned, and was completely demolished. It was replaced with a state-of-the-art, 49,683 square foot aquatic facility. The team of JVP Engineers provided a study of different alternatives to select the most adequate systems for the facility including Life Cycle Cost Analysis and consideration for LEED goals to qualify this facility as a LEED Silver Certified project.